Skip to main content
Dawn-lit Nairobi worksites
Nairobi-based civil works

Building resilient infrastructure. Restoring life to projects.

Kusa Multworks Limited delivers civil engineering, water infrastructure, and construction solutions across Nairobi — predictable, compliant, and built to last.

Technical Excellence
Timely Delivery
Enduring Durability

Our Services — what you gain

Outcome-led modules built for procurement officers, developers and private clients: predictable timelines, compliance certainty, and minimal disruption.

Building Works

End-to-end construction for residential, commercial and institutional buildings.

  • Predictable schedules with phased handover dates.
  • Quality finishes and site safety that protect occupants.
  • Coordination with local authorities for approvals.

Case: Mid-Rise Residential — Completed 48-unit block with staged occupation in 14 months.

Discuss Scope

Repair Works

Targeted repairs to structures and systems that restore service and extend life.

  • Rapid response triage and prioritised workplans.
  • Minimised disruption for occupied sites.
  • Lifecycle recommendations and costed options.

Case: Flood-damaged Retaining Wall — Stabilised and repaired with 30-year design life.

Discuss Scope

Road Works

Road upgrading, resurfacing, and safety interventions for urban corridors.

  • Traffic management plans to keep Nairobi moving.
  • Materials selected for local climate and load ratings.
  • Measurable safety outcomes and reduced maintenance windows.

Case: Ngong Road Pavement Upgrade — 6km resurfaced; lane closure impact reduced by 40%.

Discuss Scope

Water Works

Water reticulation, repairs, and small-scale supply network upgrades.

  • Designs to meet municipal water board standards.
  • Leak detection and pressure management to reduce losses.
  • Community handover and maintenance training.

Case: Kasarani Reticulation Repair — Restored supply to 4,200 households.

Discuss Scope

Project Management

End-to-end coordination: commercial control, programme management, and site administration.

  • Single-point coordination for procurement and contractors.
  • Risk register and weekly stakeholder reporting.
  • Programme-driven delivery with milestone guarantees.

Case: Mixed-use Development — Project lead from groundworks to fit-out; 0.8% variance to budget.

Discuss Scope

Construction Design & Quantity Surveying

Feasible design packages and accurate cost forecasting to reduce unknowns.

  • Practical, buildable drawings aligned to site logistics.
  • Bills of quantities and staged procurement schedules.
  • Value engineering to protect quality and reduce cost.

Case: School Extension — Value engineering saved 12% without reducing scope.

Discuss Scope
Heavy grader resurfacing road

Road Works

Upgrading and resurfacing that keeps traffic moving and reduces future maintenance cost.

  • Traffic management to preserve throughput during works.
  • Material selection aligned to local load and climate.
  • Post-construction warranty and scheduled maintenance plan.
6 km resurfaced
40% reduced lane closure impact
Case: Ngong Road Pavement Upgrade — Completed within traffic management targets, improved throughput.

Building Works

Comprehensive construction management from groundworks to fit-out, prioritising handover readiness and occupant safety.

  • Phased delivery and staged occupation planning.
  • Site safety systems and quality inspections.
  • Coordination for statutory approvals and inspections.
48-unit development
14 months to staged handover
Case: Mid-Rise Residential — Staged occupation delivered on programme.
Construction site crane
Hands repairing concrete

Repair Works

Triage, remediation and strengthening works that restore function and extend service life with clear options and costs.

  • Rapid condition assessment and prioritised interventions.
  • Works designed to minimise disruption to occupants.
  • Costed lifecycle options and warranties.
Case: Flood-damaged Retaining Wall — Stabilised and repaired with 30-year design life.

Water Works

Reticulation repairs and supply upgrades designed to meet municipal standards and restore reliable service.

  • Designs compliant with municipal water board standards.
  • Leak detection and pressure management to reduce losses.
  • Community handover and maintenance training.
Case: Kasarani Reticulation Repair — Restored supply to 4,200 households.
Technician at valve
Site manager with plans

Project Management

Commercial control, programme governance and coordination to reduce risk and keep milestones aligned.

  • Single-point coordination for procurement and contractors.
  • Risk registers and weekly stakeholder reporting.
  • Programme-driven delivery with milestone guarantees.
Case: Mixed-use Development — Project lead from groundworks to fit-out; 0.8% variance to budget.

Construction Design & Quantity Surveying

Practical design packages and precise cost forecasting to reduce procurement risk and enable staged delivery.

  • Buildable drawings aligned to site logistics.
  • Bills of quantities and staged procurement schedules.
  • Value engineering without compromising durability.
Case: School Extension — Value engineering saved 12% without reducing scope.
Site tape measure and blueprint
Call +254 700 000 000 WhatsApp

Selected projects — measurable outcomes

Embakasi Drain Rehabilitation
Client: Nairobi County (Government)
Location: Embakasi
Timeline: 6 months
Outcome: Flooding incidents down 80%.
Request Similar Quote
Ngong Road Pavement Upgrade
Client: Private developer
Location: Ngong Road
Timeline: 5 months
Outcome: Lane closure impact reduced 40%.
Request Similar Quote
Kasarani Water Reticulation Repair
Client: Residential association
Location: Kasarani
Timeline: 3 months
Outcome: 4,200 households restored supply.
Request Similar Quote

Talk to a Project Lead

For procurement, site visits, and quotes — use the form or reach us directly.

Kusa Multworks Limited — Nairobi
We use contact details to respond to enquiries. Read our privacy policy.